Do You Need a Permit to Renovate in Victoria?
General guidance, not legal advice — permit requirements depend on your specific property, council and scope of work. Always confirm with your local council or a registered building surveyor before starting.
Almost every renovation in Victoria needs some form of permit — the real question is which kind, and how long it adds to your timeline. Here's how it actually breaks down.
Building permit vs planning permit — what's the difference?
- Building permit: confirms your renovation meets structural, safety and building code requirements. Required for almost all structural work — removing walls, extensions, new bathrooms/kitchens involving plumbing changes, and most renovations beyond a cosmetic refresh. Issued by a registered building surveyor, not the council directly.
- Planning permit: confirms your renovation complies with local planning rules — height limits, setbacks, overlays (heritage, vegetation, flood) and neighbourhood character. Not every renovation needs one; it depends on your property's zoning and any overlays that apply to it.
You can need one, both, or occasionally neither (very minor cosmetic work like re-tiling or repainting typically needs neither).
When you're more likely to need a planning permit
- Your property sits within a heritage overlay — common across Boroondara (Hawthorn, Kew, Camberwell), and present in pockets of many other inner and established Melbourne suburbs. External changes almost always need a planning permit here; in some heritage precincts, internal changes can too.
- You're extending upward (second storey) or significantly changing the building's height or footprint.
- Your block has a vegetation, flood, or significant landscape overlay.
- You're close to a side or rear boundary and need a setback variation (e.g. for a granny flat or extension).
What usually only needs a building permit (no planning permit)
- Internal renovations that don't touch the building's structure or footprint (most kitchen and bathroom renovations, if you're not in a heritage overlay or changing the exterior).
- Single-storey extensions that comply with standard setback and height rules under the relevant planning scheme (VicSmart or code-assessable pathways can apply, which are faster).
- Like-for-like replacement of existing structures.
How permits affect your timeline
- Building permit only: typically adds 2–4 weeks to your project timeline once your design is finalised, assuming no issues.
- Planning permit required: typically adds 4–12+ weeks, since council assessment (and possible public notification for larger changes) takes longer than a building surveyor's building permit review.
- Heritage overlay properties: budget extra time and expect more back-and-forth on materials and external appearance, particularly for anything visible from the street.
How to avoid permit surprises
- Ask your builder to check your specific address against council overlay maps before finalising a design — not after.
- If you're in a heritage suburb, budget the extra planning-permit time into your project schedule from day one, rather than treating it as a risk.
- Get quotes that clearly state who is responsible for obtaining permits (usually the builder, via a registered building surveyor) and whether permit costs are included in your fixed price.
- Never start structural work before permits are issued — unpermitted work can create real problems at resale.
Frequently asked questions
Do I need a permit to renovate my kitchen in Victoria?
If you're not moving structural walls, not in a heritage overlay, and not changing the building's exterior, you'll typically only need a building permit for plumbing/electrical compliance — not a planning permit.
Do I need a permit to renovate my bathroom in Victoria?
Most bathroom renovations only require a building permit (for the plumbing and any structural work), not a planning permit — unless you're in a heritage overlay or changing the building's footprint.
What is a heritage overlay and how do I know if my property has one?
A heritage overlay is a planning control protecting a property or precinct's historic character. Your local council's planning scheme maps (available on the council website or via VicPlan) will show if your address is affected.
How long does it take to get a building permit in Victoria?
A straightforward building permit through a registered building surveyor typically takes 2–4 weeks once your design and documentation are complete, though this varies by surveyor and project complexity.